The Belo Monte Dam on the Xingu River is currently the largest dam project under consideration anywhere on the planet, and would be the world’s third largest in installed generating capacity if built. Belo Monte is highly complex – the project includes two dams, two artificial canals, two reservoirs (one on dry land), and an extensive system of dikes, some big enough to qualify themselves as large dams.

To build Belo Monte, more earth would have to be dug than was moved to build the Panama Canal. The sheer enormity of the project means that an area of more than 1,500 square kilometers would be devastated, resulting in the forced displacement of 20,000 – 40,000 people, and grave impacts to the land and livelihood of 800 indigenous people and thousands of riverine and urban families.

Belo Monte is one of the world’s most controversial dams; indigenous peoples and social movements in the region have fought its construction for more than 20 years. In July 2009, a delegation of groups opposing the dam met with Brazil’s President Lula, who said he would review the project and promised “no one is going to shove this project down anyone’s throats.” Yet the government is pushing through the project at all costs, in violation of Brazilian law and despite the strong opposition of indigenous groups.


brief history

Originally, five huge dams were planned for the Xingu basin, which would have flooded 18,000 sq km of the rainforest, generating over 20,000 MW of electricity. The upstream dams would have stored water for Belo Monte (then called Kararaô), making it more effective in generating electricity. They would have also flooded indigenous reserves and protected areas. That proposal was defeated in 1989 after huge opposition from the Kayapo Indians and a worldwide movement spearheaded by pop star Sting rose to defend the Kayapo's land and rights.

The Belo Monte plan was launched in 2002. Under the new engineering design for the Belo Monte complex, more than 80% of the flow of the Xingu would be diverted down two huge artificial canals - each 500 meters wide - to the powerhouse, leaving the 100-km rocky stretch downstream known as the Xingu's "Big Bend" high and dry. The powerhouse would have 11,233 MW of installed generating capacity, but would generate an average of only 4,500 MW. Belo Monte would operate at peak capacity for only a couple of months out of the year, and during the four to six-month-long low-water season on the Xingu, it would generate as little as 1000 MW of electricity.

The project's extremely high cost and inefficiency and the river's large seasonal variations in flow have led many to believe that after completing Belo Monte, Brazil will build other dams upstream with greater storage capacity to guarantee there will be enough water for Belo Monte to generate electricity year-round.


what must happen

Banks must not finance Belo Monte.  The financial viability of the project is too shaky; the lack of private investment signals a high risk on returns that the government is only able to absorb by pushing down interest rates and utilizing funds meant to pay down the public debt, such as the Fondo de Amparo ao Trabalhador (FAT) and public pension funds.  Drawing from these funds will cause considerable social unrest amongst the Brazilian public, who will be left to judge the risk involved in trading off the availability of public funds for granting energy subsidies to electro-intensive industrial sectors like mining and construction.

Meanwhile, estimates of the total cost of Belo Monte have reached as high as R$44 billion (USD $25 billion) due to increasing environmental and social costs involved in the project.

The financial risk involved in Belo Monte, the meager amount of energy produced throughout the year (only 39% of the dam's capacity without building further dams upstream), and the social risk involved in financing a project that has gained international notoriety for its impacts on indigenous people, are reasons enough for banks to refrain from financing the project.


location
image
active file
last update: Feb 02, 2012

banktrack contact

Zachary Hurwitz, International Rivers, USA
Christian Poirier
, Amazon Watch, USA

social impact

Indigenous people
Belo Monte would directly affect indigenous communities living along what is known as the Xingu’s “Big Bend.” About 800 indigenous people from the Juruna, Xikrín, Arara, Xipaia, Kuruaya, Kayapó and other ethnic groups live in this region. José Carlos Arara, who met with President Lula in July to voice his concerns, told the President “Our ancestors are there inside this land, our blood is inside the land, and we have to pass on this land with the story of our ancestors to our children. We don’t want to fight, but we are ready to fight for our land if we are threatened. We want to live on our land in peace with all that we have there.”

A panel of 40 independent experts that analyzed the project’s environmental impact assessment (EIA) found that, since the Big Bend would receive less water than at any time in its history, fish stocks would be decimated, with some species found only in the Big Bend likely to become extinct. The drying of the Big Bend would make it impossible for indigenous communities to reach the city of Altamira to sell their produce or buy staples. The lowering of the water table would destroy the agricultural production of the region, affecting indigenous and non-indigenous farmers, as well as water quality. In all probability, the rainforests in this region would not survive. The formation of small, stagnant pools of water among the rocks of the Big Bend would be an ideal environment for proliferation of malaria and other waterborne diseases.

Communities upstream, including the Kayapó Indians, would suffer the loss of migratory fish species, which are a crucial part of their diet. The Kayapó are bitterly opposed to the project and have vowed to wage war if the government proceeds.

Riverine and urban people
Officially 19,000 people would be forcibly displaced for Belo Monte, most in the city of Altamira, but the independent review of the project found the real number of directly affected people could be twice the official estimate. Contrary to what would happen in the Big Bend, Altamira’s water table would become saturated, leading to flooding throughout the city during the rainy season. More than 100,000 migrants are expected to arrive in search of work. Riverine families who have lived off of fishing and smallscale agriculture on the Xingu for decades would be forced to relocate to Altamira, where they would compete with migrants for very few jobs, most of them low-paying.

Given the limited infrastructure in the towns and villages in the region, it is expected that the vast majority of the migrants who do not find work on the dam would seek land in rainforest areas, leading to widespread deforestation and impacts on fish and wildlife, in addition to the invasion of indigenous lands.


environment

Biodiversity
Belo Monte would affect biodiversity over an extensive area of the central Amazon. The rich flooded forests of the Big Bend and middle Xingu would no longer receive seasonal floodwaters. Besides affecting endemic and migratory fish species, it would seriously affect aquatic and land fauna, including endangered species such as the white-cheeked spider monkey and black-bearded saki monkey. Threatened turtle species downstream would lose their breeding grounds.

Climate change
Belo Monte is being proposed as a renewable energy project and an important part of the country’s commitment to reduce emissions by 38% by 2020. Yet reservoirs in tropical forests like the Amazon can themselves be significant sources of greenhouse gas emissions due to decomposing vegetation.

According to Philip Fearnside, Brazil’s foremost expert on reservoir emissions, Belo Monte is unlikely to be a standalone project due to its low generating capacity in the dry season. Fearnside therefore assumes that the Babaquara Dam – a much larger storage dam – will be built upstream. According to Fearnside, during the first 10 years of operation, the Babaquara and Belo Monte dams combined would have emissions four times higher than an equivalent fossil-fuel plant. After 20 years, the project would still have 2.5 times the emissions of a fossil-fuel plant. Even discounting its massive social and environmental impacts, the project can hardly be seen as clean.


human rights

The indigenous people of the Xingu Basin claim that they were never adequately consulted about the project, in violation of their Brazilian constitutional rights and their rights to free, prior and informed consent under international law. Opponents of the project have received death threats and have been subjected to initimidation.


other issues

Transmission lines would be constructed to connect Belo Monte with the central grid, meaning that the electricity from Belo Monte could go nearly anywhere in Brazil. But it’s most likely to go first to expanding aluminum, iron, and other smelting operations in the Amazon such as Juriti, Carajas, and Paragominas, owned by Alcoa and Vale.  The energy would also go to fuel the powerful industrial sector in southeast Brazil, which consumes 28.6% of all electricity in the country, mainly in São Paulo and Minas Gerais.

Alternatives
Considering Belo Monte’s astronomical cost, even without accounting for its social and environmental impacts, Brazil would be well-advised to give greater priority to less destructive alternatives. A study by WWF-Brazil published in 2007 showed that by 2020, Brazil could cut the expected demand for electricity by 40% through investments in energy efficiency. The power saved would be equivalent to 14 Belo Monte hydroelectric plants. This would result in national electricity savings of up to $19 billion by 2020, and reduce installed capacity by 78,000 MW. WWF-Brazil’s “PowerSwitch Scenario” would also generate 8 million new jobs through power generation from renewable sources such as biomass, wind, solar and small hydro, avoiding the need to build dams in the Amazon. These renewable sources could account for 20% of the total electricity generated in the country by 2020.

image
active file
last update: Feb 02, 2012

banktrack contact

Zachary Hurwitz, International Rivers, USA
Christian Poirier
, Amazon Watch, USA

Nov 08, 2011

On October 27, 2011, the Belo Monte Dam construction site was occupied by 400 indigenous people, fishermen and riverine community members who oppose the project due to its severe environmental impacts and human rights violations.  Norte Energia, S.A. ordered the military police to clear the area, which occurred the following day.

In October, one lawsuit, regarding lack of prior consultation with affected indigenous communities, began trial in the Brazilian Regional Federal Tribunal.  Federal judge Selene Maria de Almeida argued that the Belo Monte Dam licenses are illegal and must be cancelled due to evidence that the Brazilian government did not hold proper consultations.  A second judge argued to the contrary.  The third of three judges will grant her decision on November 9th, 2011.  

There are currently at least 12 lawsuits pending in Brazilian courts pertaining to Belo Monte Dam. 

The IACHR of the Organization of American States is currently weighing the possibility of an action against the Brazilian government for having failed to undergo thorough consultations of affected indigenous communities.

On June 1st, the Brazilian government approved an Installation License for the controversial Belo Monte Dam in the Amazon.  The environmental agency IBAMA approved the Installation License without project developer Norte Energia (75% owned by the government) fulfilling the 40 social-environmental prerequisites to the project that had been mandated in 2010.  There is now an 11th lawsuit, as a result (read more).

After news of the installation license was broadcast over the internet, street protests against Belo Monte began to erupt in São Paulo, Rio, Salvador, Belém, and in the Xingu basin itself, where last weekend legendary Kayapó chief Raoni convened men and women from the tribe to protest in the town of Colider, dancing and chanting war songs, vowing to put their lives on the line to resist Belo Monte (read more).

On February 25, 2011, judge Ronaldo Destêrro of a Federal Court in Belém suspended IBAMA's partial license, halting any construction efforts, and preventing BNDES from releasing any funds, until the 40 conditions of the dam's environmental license were met.

In February 2011, Curt Trennepohl subsituted Americo Tunes as the new president of IBAMA.

In January 2011, Abelardo Bayma Azevedo resigned as President of IBAMA, over pressure to approve an Insallation License for Belo Monte Dam.  In February 2011, interim IBAMA President Americo Tunes approved a "partial" installation license considered illegal by Brazilian lawmakers, and issued authorizations to begin vegetation clearing in the project's easement areas.

Eletrobras announced in August, 2010 that it would purchase the 30% of electricity from Belo Monte destined to both the "free" market and the "autoprodutor" market, and then resell to the "autoprodutores," so as to insure that the electricity would have a buyer (source: O Globo).

The government has assigned 70% of Belo Monte's electricity (3093 MW) to go to the "captive" market for public consumption, at a price of R$78 (around USD $45) per MWh.  20% of the electricity (884 MW) will be bought by Eletrobras at a price of R$130 (around USD $74) per MWh to sell to the "free" market.  The remaining 10% of the electricity (442 MW) is assigned specifically for consumption by "autoprodutores," or energy-intensive industries who both produce and consume energy, at a price of R$100 (around USD $57) per MWh (source: Valor Econômico).

The Federal Attorney General's office in Brazil is currently investigating the possibility that the auction was held before an appellate court lifted the third restraining order, which would make the auction results illegal.

BNDES will fund at least 80% of the project costs (estimated between US$11bn and US$18bn), and the remaining 20% will be financed by the Norte Energia consortium. 

On May 25, 2010 three members of the consortium building the dam decided to pull out. Their reasoning for pulling out is based on what they deem "growing state control of the project" (read more).

Despite three federal restraining orders to halt the project auction, on April 20, 2010 the Norte Energia consortium won the right to build the Belo Monte hydroelectric dam on the Xingu river.  The Norte Energia consortium is led by Eletronorte, a subsidiary of state-owned utility holding group Eletrobras, and currently includes the participation of 18 companies.

image
active file
last update: Feb 02, 2012

banktrack contact

Zachary Hurwitz, International Rivers, USA
Christian Poirier
, Amazon Watch, USA

financial institutions involved
insurance companies
ACE
IRB-Brazil Re
  • shares/bonds underwriter or manager: (July 11, 2011)
    IRB-Brazil Re is reported to cover 22% of the risk.
    source: Noticia.cfm?id=389018
MAPFRE
  • shares/bonds underwriter or manager
    MAPFRE is reported to cover 30% of the risk.
    source: Noticia.cfm?id=389018
Munich Reinsurance AG
  • shares/bonds underwriter or manager: R$40 million (July 11, 2011)
    http://www.amazonia.org.br/noticias/noticia.cfm?id=389018
    source: Munich Re is reported to cover 25% of the risk.
banks
Banco do Brasil - profile
  • approached/interest: Banco do Brasil may fund R$5.5 billon ($3.2 billion USD), or about 30% of Belo Monte's stated cost. (September 9, 2010)
    source: Valor Econômico, "BB empresta R$ 5,5 bilhões para a usina de Belo Monte"
national development banks
BNDES
The Brazilian Development Bank BNDES (Banco Nacional de Desenvolvimento Econômico e Social)
  • approached/interest: BNDES has publicly committed to funding up to 80% of Belo Monte, but can only legally fund 25% of its referential patrimony, or R$14.5 billion reais ($8.4 billion USD) of Belo Monte, in accordance with BNDES' adherence to the Basil Accords.
  • approached/interest: BNDES is offering 30-year interest periods at 4%, way below the cost of capital.
  • line of credit: BNDES issued a line of credit of R$7 billion (USD $4 billion) for the purchase of hydroelectric machinery and equipment. The line of credit was funded by a capital injection of R$74.2 billion (USD $42.35 billion) by the National Treasury.
    April 15, 2010
    source: O Globo, "CMN aprova linha de R$ 7 bilhões para equipamentos de hidrelétricas"
  • line of credit: An additional R$1 billion was destined for the purchase of hydroelectric machinery and equipment as part of a R$ 7 billion credit to increase the export of durable consumer goods. The line of credit stipulates that 60% of the products that utilize the credit must be produced nationally. (April 29, 2010)
    source: O Globo, "BNDES terá linha de R$ 7 bi para exportação de bens de consumo. Linha para hidrelétrica ganha R$ 1 bi"
  • line of credit: Alstom, Voith Siemens, and Vatech Andritz are utilizing BNDES' line of credit for hydroelectric machinery and equipment to subsidize up to 30% of their offer to supply turbines for Belo Monte. The companies each have manufacturing plants within Brazil. (June 8, 2010)
    source: Folha de São Paulo, "Europeus devem equipar Belo Monte"
investment funds
FI-FGTS
Fundo de Investimento do Fundo de Garantia do Tempo de Serviço
  • corporate loan: FI-FGTS disbursed R$ 280 million (USD $160 million) to Grupo Bertin through its infrastructure investment fund. Grupo Bertin owns two of the companies participating in Belo Monte: Contern Construções (3.75%) and Gaia Energia e Participações (10.02%) (April 25, 2010)
    source: O Globo, "Bertin obteve R$280 milhoes do fundo FI-FGTS"
  • project finance: FI-FGTS will finance close to 5% of Belo Monte, through its 40% holding in J. Malucelli. (June 11, 2010)
    source: Valor Economico, "Fundos se acertam em Belo Monte"
pension funds
Funcef
pension fund of Caixa Economica Federal employees, 3rd largest in Brazil, signatory of UNPRI
  • approached/interest: Funcef has expressed interest in participating in Belo Monte by drawing from its R$2billion commitment to infrastructure (Feb 2, 2010)
    source: O Globo, "Funcef recupera perdas e pretende investir em Belo Monte"
  • project finance: Funcef will invest in 5% of Belo Monte; half will be direct investment (2.5%), and half will be through a partnership with Engevix called Caixa FI Cevix (2.5%) (July 15, 2010)
    source: Estadão, "Previ está entre socios de Belo Monte, diz Eletrobras"
Petros
pension fund of Petrobras employees, 2nd largest in Brazil, signatory of UNPRI
  • approached/interest: Petros has expressed interest in participating in Belo Monte.
  • project finance: Petros will directly finance 10% of Belo Monte. (June 14, 2010)
    source: Valor Economico, "Fundos se acertam em Belo Monte"
Previ
pension fund of Banco do Brasil
  • approached/interest: Previ is reported to be interested in investing in Belo Monte. (May 15, 2010)
    source: O Estado de São Paulo, "Fundos de pensão estatais terão 10% da usina de Belo Monte"
  • project finance: Previ will indirectly finance 10% of Belo Monte through a partnership with Spanish electric utility Iberdrola, in Bolzano Participações (10%). (July 15, 2010)
    source: Estadão, "Previ está entre socios de Belo Monte, diz Eletrobras"
multilateral development banks
World Bank (IBRD, IDA)
  • On 5 March, 2009, the World Bank approved a US$1.3 billion loan to Brazil for "environmental protection” which is weak in terms of environmental performance criteria and a number of governance issues. Bolstering BNDES, part of the money could be used for the Belo Monte dam.

The 18 members of the Norte Energia consortium are expected to fund the remaining 20% of the project that is not financed by BNDES, the Brazilian National Development Bank.

image
active file
last update: Feb 02, 2012

banktrack contact

Zachary Hurwitz, International Rivers, USA
Christian Poirier
, Amazon Watch, USA

image
active file
last update: Feb 02, 2012

banktrack contact

Zachary Hurwitz, International Rivers, USA
Christian Poirier
, Amazon Watch, USA

2011 2010
image
active file
last update: Feb 02, 2012

banktrack contact

Zachary Hurwitz, International Rivers, USA
Christian Poirier
, Amazon Watch, USA

image
active file
last update: Feb 02, 2012

banktrack contact

Zachary Hurwitz, International Rivers, USA
Christian Poirier
, Amazon Watch, USA

pictures
Belo Monte dam project Apr 29, 2010

Belo Monte Dam Protest and Petition Delivery Feb 08, 2011

Protests against Andritz Mar 14, 2011

videos

Wrong Climate for Damming Rivers
Jan 02, 2012 -

Sigourney Weaver Narrates Google Earth Tour of Belo Monte Dam
Jun 29, 2011 -

A call for renewable energy in Brazil
Apr 28, 2011 - "Amazon Watch journeyed back to the Brazilian Amazon with James Cameron and this time, he brought Arnold Schwarzenegger. The team returned to the Arara village on the threatened Big Bend of the Xingu River and was met by hundreds of villagers, the legendary Kayapo Chief Raoni, world-renowned climate scientists and local movement leaders. Their resounding message was the same: "We urge the Brazilian government stop the Belo Monte Dam and pursue truly renewable energy alternatives!" "

A Message From Pandora
Oct 05, 2010 - Take action now to join the battle: http://bit.ly/AWatch "A Message from Pandora" is a special feature produced by James Cameron about the battle to stop the Belo Monte Dam on the Xingu, one of the great tributaries of the Amazon River.

International Rivers about Belo Monte
Sep 27, 2010 - Brent Millikan, Amazon Program Director of International Rivers, speaks about the problems with Belo Monte.

Defending the Rivers of the Amazon, with Sigourney Weaver
Aug 30, 2010 - Sigourney Weaver Narrates New Google Earth Animation on Brazil's Controversial Belo Monte Dam in the Amazon Rainforest.

5-Leader Aritana, Alto Xingu, about BELO MONTE
Aug 25, 2010 -

Xingu: O sangue da nossa sobrevivência I Parte (Portugese)
Jul 22, 2010 -

Xíngu O sangue da nossa sobrevivencia II Parte (Portugese)
Jul 22, 2010 -

Xingu: O sangue da nossa sobrevivência III Parte (Portugese)
Jul 22, 2010 -

Xingu: o sangue da nossa sobrevivência IV Parte Final (Portugese)
Jul 22, 2010 -

Xingu: Why we don't want Belo Monte
Apr 28, 2010 -

Images from Belo Monte on usstream.tv
Apr 27, 2010 -

image
active file
last update: Feb 02, 2012

banktrack contact

Zachary Hurwitz, International Rivers, USA
Christian Poirier
, Amazon Watch, USA

Login
username
password
Good login. Redirecting to
'My Banktrack'.
Wrong login. Click here to request your password.
An email has been sent with your login!
Request password
This email is unknown.
<< Back
Keep up-to-date!
Please provide a valid email.
Search
Please provide one or more search terms
contact
route
Vismarkt 15
6511 VJ Nijmegen
Netherlands

Tel: +31 24 3249220
beatrijs@banktrack.org
Contact us